Guideline for Preservation of New Equipment and Piping During Plant Construction (406)

 View Only

Develop a Guideline that covers the basic degradation mechanism that can damage equipment and piping during plant construction, pre-commissioning.  List the mitigation and prevention steps, be aware that these have changed with module fabrication in low cost countries and ban on many corrosion inhibitors due to environmental concerns. The MTI guideline should become an “industry standard” that can be shared with non-materials/corrosion engineers to avoid MIC failures. It should describe cases and have concise MIC mitigation treatment plans/descriptions for these cases.